MINING
Electric draglines, face shovels, hydraulic excavators, coal processing plants and blast hole drill rigs, rebuilt in the Paget workshop or on the machine in the pit.
BUILT AROUND DRAGLINE AND SHOVEL WORK
Mining is the core of the business. We service electric draglines and face shovels, hydraulic excavators, coal processing plants and blast hole drill rigs across the Bowen Basin, with planned shutdowns, emergency breakdowns and in situ rebuilds backed by the full workshop.
New manufacture and repair covers rope sheaves and drums, walking frames, pins and bushes, cams and shafts, fairlead and boom point assemblies, load rollers and drive sprockets, along with structural repairs to booms, side frames, car bodies, upper frame modules, dippers and buckets.
The fabrication building runs 90 m long, 30 m wide and 16 m high, with four dragline bucket arch pits and sheave rotators to 5 m diameter, so a bucket or an arch is set up, turned and welded in the one place.
WHAT A MINING COMPONENT MEETS HERE
- CNC floor borer
- 13 m travel, 6 m column, workpieces to 150 t
- Gear cutting
- Internal and external gears to 5.5 m diameter
- Slew bearings
- Rebuilt and warranted from 30% of replacement cost
- Induction hardening
- 200 to 400 kW, to 60 HRC, 3 to 15 mm case depth
- Jacking presses
- To 600 tonnes for gear case overhaul
- Bucket arch pits
- Four pits in a bay 90 by 30 by 16 m high
- Factory crane
- 150 t lift capability, 12 m under hook
- Field record
- Principal contractor, six week ROM shutdown at BMA Peak Downs
IN THE PIT, ON YOUR SHUTDOWN
Field crews take the same capability to the machine. ABC has been principal contractor for a six week ROM shutdown at BMA Peak Downs and has held five years of monthly maintenance at Coppabella, LTI free, with in situ hoist and drag drum rebuilds and Marion 8750 propel gear case change outs done in place.
Slew bearing work is supported on site with condition monitoring, in situ change out tables, an integrated excavator jacking and support stand system and car body drive out options, so the change happens on your schedule rather than ours.
Transport moves the component both ways, 24/7, with low loaders to 50 tonnes, Franna cranes and prime movers on flat and drop deck trailers.
RELATED WORK
- 01Large Diameter Slew BearingsExcavator, crane and industrial bearings condition assessed, then rebuilt and warranted f…
- 02Steel Fabrication & WeldingRope sheaves and drums, walking frames, booms, dippers and buckets, with four dragline bu…
- 03Machining13 m of borer travel takes a workpiece to 150 t, and gears are cut internally and externa…
- 04FittingGear cases are overhauled to OEM specification with jacking presses rated to 600 tonnes,…